Processing

Processing

We have two processing lines, which can handle 12 tons/hour on the main line and 4.5 tons/hour on 2nd line.

The main line has two cylinders, while the other has one cylinder.

We also have silos in both processing lines that are can stored around 8 tons on the main line and 4 tons on the 2nd line.

Silo on 2nd Line

Main processing line also equipped with a NTRM Shorter which utilize laser technology.